Model |
XR-25 |
XR-35 |
XR-50 |
XR-70 |
XR-100 |
XR-150 |
|
Temperature control range |
-40 ℃ ~ 200 ℃ |
||||||
Extensible |
-40 ℃ ~ 250 ℃(XRV series) |
||||||
Temperature control mode |
PID fuzzy control |
||||||
Controller |
LCD display set temperature and measured temperature, touch key input |
||||||
Evaporator |
plate exchanger |
||||||
Compressor |
French Taikang American Copeland |
||||||
Refrigerant |
R404A |
||||||
Temperature control object |
Thermal medium temperature control |
||||||
temperature feedback |
Thermal medium temperature feedback PT100 |
||||||
Temperature control accuracy |
± 0.5 ℃ |
||||||
Heating power |
2.5KW |
3.5KW |
5.5KW |
7.0KW |
10.0KW |
15.0KW |
|
Cooling capacity ℃ |
200 |
2.5KW |
3.5KW |
5.5KW |
7.0KW |
10.0KW |
15.0KW |
|
100 |
2.5KW |
3.5KW |
5.5KW |
7.0KW |
10.0KW |
15.0KW |
|
20 |
2.5KW |
3.5KW |
5.5KW |
7.0KW |
10.0KW |
15.0KW |
|
0 |
2.5KW |
3.5 KW |
5.5KW |
7.0KW |
10.0KW |
15.0KW |
|
-20 |
2.2KW |
3KW |
4KW |
5.2KW |
7.6KW |
10.0 |
|
-35 |
0.5KW |
0.9KW |
1.2KW |
1.6KW |
2.4KW |
3.2KW |
Flow and pressure of circulating pump |
Max20L/min 2BAR |
Max20L/min 2BAR |
Max35L/min 2BAR |
Max35L/min 2BAR |
Max50L/min 2BAR |
Max110L/min 2BAR |
|
Safety protection |
With self-diagnosis function; refrigerator overload protection; high pressure switch, overload relay, thermal protection device and other security functions. |
||||||
closed circulation system |
The whole system is a fully closed system, there will be no oil mist at high temperature, and the water in the air will not be absorbed at low temperature. The system will not increase the pressure due to high temperature during operation, and the heat conduction medium will be automatically supplemented at low temperature. |
||||||
Interface size |
G1/2 |
G3/4 |
G3/4 |
G3/4 |
G3/4 |
G1 |
|
Exterior dimension |
500*680*1350 |
550*680*1350 |
550*680*1450 |
620*680*1550 |
620*680*1550 |
750*750*1750 |
|
Weight |
160KG |
185KG |
210KG |
255KG |
300KG |
340KG |
|
Power |
AC220V 50HZ 4.5KW (max) |
AC380V 50HZ 6.5KW (max) |
AC380V 50HZ 9KW (max) |
AC380V 50HZ 12.5KW (max) |
AC380V 50HZ 16.5KW (max) |
AC380V 50HZ 24KW (max) |
|
Shell material |
Spray plastic for cold-rolled sheet |
||||||
Power supply option |
220V 60HZ three-phase, 440V ~ 480V 60HZ three-phase |
||||||
Explosion-proof optional |
ExdIIBT4 or positive pressure explosion-proof |
Quality Assurance
Ensure that the goods sold are brand new products that meet the requirements of the contract and are qualified by the factory inspection, and that the quality, performance, technical indicators and configuration are in accordance with the contract and the manufacturer's technical documents.
Installation and commissioning
After arrival, if on-site installation and debugging are required, our company or our company's agent shall be responsible for the installation and debugging of the instrument.
Acceptance
After installation and commissioning, the customer shall confirm that the goods are brand-new products in accordance with the contract, and that the quality performance, technical indicators and random configuration are in accordance with the contract and the manufacturer's technical documents, and after confirming the acceptance of the full set of technical documents, sign the installation acceptance report to confirm the acceptance.
Training
At the same time of equipment installation and commissioning, our company's after-sales service engineer is responsible for on-site technical training for users until users can operate skillfully. During the use of the instrument, customers can consult the after-sales service personnel of our company for relevant technical problems at any time, and arrange on-site training or remote guidance by our company according to the situation.
After-sales service
From the date of acceptance, a one-year free warranty will be provided, and all maintenance costs and spare parts costs during the warranty period will be free (the cost price of spare parts will be charged for instrument failure caused by human factors); After the warranty period, the equipment will be responsible for maintenance for life and will be charged appropriately according to the actual maintenance cost.
Service Commitment
After receiving the customer's written repair, respond within 24 hours; and according to the customer's location, arrive at the scene within 48 hours to solve.
Key words:
Heating and cooling temperature control system
Heating refrigeration circulator
Low temperature refrigeration circulator
Heating circulator
Positive pressure explosion-proof
Isolation and explosion-proof
Cooling water circulator
Other products
Other Products
Introduction
Online consultation