Model |
LD-4W |
LD-6W |
LD-8W |
LD-12W |
LD-20W |
LD-30W |
LD-40W |
LD-60W |
LD-90W |
LD-120W |
LD-180W |
Temperature range |
-80 ℃ ~-30 ℃ |
||||||||||
Cooling capacity AT-75 ℃ |
4kW |
6kW |
8kW |
12kW |
20kW |
30kW |
40kW |
60kW |
90kW |
120kW |
180kW |
|
3440 Kcal/H |
5160 Kcal/H |
6880 Kcal/H |
10320 Kcal/H |
17200 Kcal/H |
25800 Kcal/H |
34400 Kcal/H |
51600 Kcal/H |
77400 Kcal/H |
103200 Kcal/H |
154800 Kcal/H |
Circulating pump |
6.6m3/H 2.5bar |
6.6m3/H 2.5bar |
9m3/H 2.5bar |
15m3/H 2.5bar |
25m3/H 2.5bar |
25m3/H 2.5bar |
25m3/H 2.5bar |
25m3/H 2.5bar |
25m3/H 2.5bar |
25m3/H 2.5bar |
25m3/H 2.5bar |
Inlet and outlet liquid size |
DN25 |
DN25 |
DN32 |
DN40 |
DN50 |
DN50 |
DN50 |
DN65 |
DN65 |
DN80 |
DN80 |
Cooling water 30 degrees |
10m3/H DN40 |
14m3/H DN50 |
20m3/H DN65 |
25m3/H DN65 |
35m3/H DN80 |
45m3/H DN100 |
65m3/H DN100 |
90m3/H DN125 |
120m3/H DN150 |
180m3/H DN200 |
250m3/H DN200 |
Expansion tank |
100L |
175L |
250L |
350L |
500L |
600L |
750L |
1000L |
1350L |
1800L |
2200L |
Compressor |
Emerson Copeland, Carlisle, Hanzhong, Fusheng, BITZEL Compressor |
||||||||||
Evaporator |
plate heat exchanger |
||||||||||
Refrigerant |
R404A /R23 or R508B |
||||||||||
refrigerant carrier |
Ethanol, dichloromethane, heat transfer oil, etc. |
||||||||||
Security Protection |
High voltage protection, water cut-off protection, over current protection, leakage protection, continuous and off protection, high temperature protection, sensor failure, low liquid level alarm and other multiple safety protection |
||||||||||
Level indication |
Glass level indication |
||||||||||
Pipe material |
SUS304 is adopted for expansion tank, cold storage tank and circulating pipeline |
||||||||||
Shell material |
Spray 7035 for sealing plate of channel steel square tube cold rolled plate |
||||||||||
Overall dimensions cm |
100*150 *185 |
200*145 *205 |
200*145 *205 |
250*145 *225 |
250*145 *225 |
350*160 *225 |
380*160 *225 |
400*160 *225 |
500*200 *225 |
650*200 *225 |
650*220 *235 |
Power MAX 380V 50HZ |
14kW |
18kW |
30kW |
43kW |
69kW |
101kW |
136kW |
200kW |
295kW |
396kW |
588kW |
Noise |
Within 75 decibels |
Within 80 decibels |
Within 90 decibels |
||||||||
Weight |
950KG |
1100KG |
1400KG |
1800KG |
2200KG |
3000KG |
3500KG |
4000KG |
5000KG |
6000KG |
8000KG |
Quality Assurance
Ensure that the goods sold are brand new products that meet the requirements of the contract and are qualified by the factory inspection, and that the quality, performance, technical indicators and configuration are in accordance with the contract and the manufacturer's technical documents.
Installation and commissioning
After arrival, if on-site installation and debugging are required, our company or our company's agent shall be responsible for the installation and debugging of the instrument.
Acceptance
After installation and commissioning, the customer shall confirm that the goods are brand-new products in accordance with the contract, and that the quality performance, technical indicators and random configuration are in accordance with the contract and the manufacturer's technical documents, and after confirming the acceptance of the full set of technical documents, sign the installation acceptance report to confirm the acceptance.
Training
At the same time of equipment installation and commissioning, our company's after-sales service engineer is responsible for on-site technical training for users until users can operate skillfully. During the use of the instrument, customers can consult the after-sales service personnel of our company for relevant technical problems at any time, and arrange on-site training or remote guidance by our company according to the situation.
After-sales service
From the date of acceptance, a one-year free warranty will be provided, and all maintenance costs and spare parts costs during the warranty period will be free (the cost price of spare parts will be charged for instrument failure caused by human factors); After the warranty period, the equipment will be responsible for maintenance for life and will be charged appropriately according to the actual maintenance cost.
Service Commitment
After receiving the customer's written repair, respond within 24 hours; and according to the customer's location, arrive at the scene within 48 hours to solve.
Key words:
Heating and cooling temperature control system
Heating refrigeration circulator
Low temperature refrigeration circulator
Heating circulator
Positive pressure explosion-proof
Isolation and explosion-proof
Cooling water circulator
Other products
Other Products
Introduction
Online consultation